House Construction Cost Estimator
Enter the built-up area, the number of floors and your local rate per square foot. The tool gives the total cost, a stage-wise breakup and approximate material quantities. All rates and factors are editable, because they change by place and time.
Your house
Material factors per sq ft (editable)
How much does it cost to build a house?
Before you start building, you need a budget. The usual way to get a first figure is to multiply the built-up area in square feet by the rate per square foot that builders charge in your area. This tool does that, adds the cost of extras such as the compound wall and borewell, and then splits the total into the stages of construction so that you can plan payments.
It also gives a rough idea of how much cement, steel, sand, aggregate and bricks a normal house needs, so you can talk to your mason and your supplier with a number in hand.
How to use the estimator
- Enter the built-up area of one floor and choose the number of floors. Built-up area includes the walls and the sit-out, not the open land.
- Choose the quality of work: basic, standard or premium.
- Type the rate per square foot that local contractors tell you. This is the most important number. The suggested value is only a placeholder.
- Add the extras. Read the total, the stage-wise breakup and the material quantities. Copy, print or share the result.
Stage-wise breakup
| Stage | Share of the construction cost |
|---|---|
| Foundation and basement | 18% |
| Structure: columns, beams, slab, walls | 32% |
| Plastering and flooring | 16% |
| Doors, windows and woodwork | 10% |
| Electrical and plumbing | 12% |
| Painting and finishing | 8% |
| Other and contingency | 4% |
Material quantities
The material factors are common rules of thumb for an RCC house: about 0.4 bag of cement, 4 kg of steel, 1.8 cubic feet of sand, 1.35 cubic feet of aggregate and 8 bricks per square foot of built-up area. They change with the design, the soil and the type of wall. All of them can be edited, and your engineer's bill of quantities is the figure to follow.
Ways to keep the cost under control
- Fix the plan and the finishes before you start, because changes during building cost the most.
- Get quotes from two or three contractors and compare what each one includes.
- Keep 5 to 10 percent extra for price rises and surprises.
- Pay in stages after each stage of work is complete.
- Use a licensed engineer for the plan and the structure.